321546

Thursday, 20 July 2017

Alternate Energy Wind Turbine Erection

Though this wind turbine construction was done in the U.S.A., the process can't be a whole lot different to build the ones we have here in Alberta. Pretty fascinating to watch one being erected in a time lapsed 6 minutes, and there are some pretty cool facts they display during the video that makes it all the more interesting. Even more so for me, as a Journeyman Crane Operator, as that was my former trade before getting into the exciting world of insurance.

No comments:

Post a Comment